Cape Lambert Liquid Fuel System

Information

Client: Monadelphous Engineering Associates Pty Ltd
Location: Cape Lambert, WA
Scope: 7km DN100 aboveground diesel pipelines and three pump/delivery stations
Date:
Project Length:
Value: ~$1.2M

Industry

Mining

OSD’s Role

  • Engineering Design
  • Procurement
  • Commissioning

Summary

As part of the Rio Tinto Iron Ore PSU 330B project, involving the installation of power generation and
transmission system equipment across the Pilbara region of Western Australia, the liquid fuel handling facilities at Cape Lambert required upgrading.

The upgrade work involved the design, supply, construction and commissioning of the following:

  • Cape Lambert Fuel Facility (CLFF) pumping station inclusive of transfer pumps, pipework, valves etc.
  • 6.5km DN100 aboveground pipeline between CLFF and 10KP Locomotive Refuelling facility
  • 10KP pumping station and ancillary components to integrate with the existing CLFF
  • 0.4km DN100 aboveground lateral pipeline from the CLFF and 10KP pipeline to the new Cape Lambert Power Station (CLPS)
  • Pumping station at CLPS inclusive of liquid fuel return pump and filtration
  • All associated civil, structural, mechanical, piping, electrical and instrumentation works

OSD was subcontracted to provide the engineering design, procurement and commissioning of the pipelines and associated facilities.